Designing a building to come apart sounds like an expensive philosophy. In practice it is a short list of substitutions. These twelve cover most of a wood-framed building. Each one is a detail to be drawn, built, timed and priced. After that, it is no longer unfamiliar work.

This is version 0.1 of our own list. We publish it knowing that some rows will turn out wrong.

The usual detailThe swapCostWatch for
Subfloor glued and nailedScrewed down over a rubber gasket or matA little more laborSqueaks and bounce
Sheathing fixed with ringed nailsSmooth nails, with the sheathing treated as the part you will loseNone, if the nail is simply specifiedScrews need an engineer’s approval
Siding nailed to the sheathingClipped or screwed to battens over the weather barrierAbout the sameIt also drains better
Spray foam insulationMineral wool batts or blown cellulose behind nettingOften cheaperThe airtight layer must be separate
Roofing membrane glued downMechanically fastened over a slip sheetAbout the sameWind uplift; warranty terms
Brick in cement-rich mortarLime mortar, or dry-stacked with tiesSimilar material, more skillLimits on strength and exposure
Wallboard taped and muddedScrew-fixed boards with open joints, or a demountable systemHigher at firstFire ratings must be checked
Ceilings glued or tapedLay-in or hook-on panelsAbout the sameSound
Welded steel connectionsBolted connectionsDepends on the fabricatorEarthquake detailing and approvals
Concrete topping bonded to the floorA floating topping on a slip sheet, or dry panelsAbout the sameSound, and how the floor acts as a whole
Pipes and wires bored through the frameA dedicated service cavity or raised floorA little floor areaMakes the house tighter
Window sealed to the sheathingWindow set in a shop-built frame on compression gasketsA moderate premiumWater at the frame

How to read the list

Half the rows cost about the same or less. For most of the others the extra is small, and much of it is the cost of doing something for the first time.

Two kinds of wall resist all of this, for good reasons. Walls that brace a building against earthquakes and walls rated for fire are tested as exact assemblies. We accept that those stay permanent, keep them few and write down where they are. Saying so plainly is what makes the other rows believable.

The glue was often doing a different job. Look closely and the adhesive is silencing a squeak, stopping a draft or hiding a gap. Each of those jobs has another answer.

When glue can’t be avoided

Stick it to something cheap. Bond the flooring to a thin underlay, not to the structural floor. Bond the roof membrane to a cover board, not to the deck. The glue stays, but the loss moves to a part worth a few dollars.

The test

The only honest measure is a stopwatch. Build one bay of the wall, take it apart, and time it. We plan to do exactly that with each of these, and to publish the times, including the ones that embarrass us.

Drafted with AI assistance from Viridian's working papers and detail guides, then read, corrected and approved by Keith Cash, co-founder. Found a mistake? Tell us.